2022-06-20

Idea Box: A Small Solar Lighting System Etc. for the Bedroom.

 Overview:

Using some GEL batteries for providing light in the bedroom. Using small panels mounted to the "top window panes", and a simple charge controller, e.g. the 10A model I already have. Tests of small solar panels will have to be made to see if they can provide sufficient power for the night light, as well as power for MP3 player(s) and amplifier(s), so some audio (e.g. audio books) can be played in there. If necessary, an externally mounted solar panel can be used, but a fully indoor system is preferred.

If this works a similar system can be used in the living room. Both rooms have windows facing South, so it might be possible.

A bit of testing and design:

All this should be tested, (and possibly used) until a more permanent system can be made for solar powering more of the house, e.g. a solar powered audio player system. 

A video player system will require more power, but this can be a start before more solar (entertainment) becomes available in the house.

Bedroom system:

Here is an idea for a small solar power system for the bedroom. As you can imagine, the power requirements for bedroom lighting are not very large, so I would like to add a low power "entertainment system", just for audio, some very low level "orientation lighting" with short LED strips, a "reading light", and a tiny audio system with one of my MP3 players, so I can listen to audio books when resting there, and a charger for the mobile devices, such as phone, tablets and e-readers. I suspect that I can keep the daily energy consumption down to some 10s of Wh, so I need to make myself a budget. 

First I will have to test the energy consumption of the different devices I have, then calculate the needed overhead of power, e.g. make an estimate of the number of sun-less days I need to have energy storage for.

I finally located some small panels I have. They are so-called 20W ones. I need to test them to see how it works in full sunlight (open circuit voltage and short circuit current test), and how they they work behind my windows I will try to make the system with some of those. I have 9 of them, so I should get sufficient power for some low light and some audio in the bedroom, probably using 3 or 4 of them. Even if they are only 10 - 15W the system should work. An effective 40W will likely be sufficient for the bedroom system.

Somewhere I should have a box of single cells and very small panels that I should test and see if I can get sufficient power out of them for similar systems

For similar systems I might also try to salvage some small panels from worn-out (discarded) solar-power-packs as well.

If I consider the idle current draw for the charge controller too high, I have to make a simple one myself, or a switching circuit for disconnecting it when there is no sunlight. 

If I get satisfied with this system I may make other low power systems for other uses, e.g. a weather station with remote sensing and rechargeable batteries as power supply.

Let this be the first test ...

2022-06-12

Es on 10m, 6m and 4m.

 The sporadic E season seemed to start a bit slow this year.

OK, I was away for a week around 3. June, so I have probably missed several openings.

Now I am back, and the activity has got going again.

In my 5W challenge I have worked a few dozen QSOs on 10 and 6m. The QSOs worked in the challenge just passed 200, so I am fully on track. On 4m I worked a single station with 25W, and could probably have done more with more activity.

The solar activity has been a bit lower after the quite strong activity we have had in April and May. The SFI just dropped below 100 for a few days, but now it is coming up again. There was one spotless day (the first this year, I think). The geomagnetic field has been rather quiet, as there have been no significant flares or coronal holes to send any substantial solar wind in the direction of Earth.

The solar power for the shack is still insufficient for the use of all the radios I want to make use of in this time when propagation monitoring is quite interesting for the high HF bands and the VHF bands. More battery capacity as well as solar panels need to be connected, and some low power monitor receiving equipment is also needed.

There are now 8  LiFePO4 cells ready to build a battery for the lab I have upstairs. All have been charged and balanced with the small solar power system for the lab, and I still have 20 cells to prepare for more energy storage.

What I need for making a good, solid battery (12V - 200Ah) will be some bus bars (heavy duty copper connections between the cells) Right now I will test the system with a somewhat lower load, and therefore I *can* use some heavy duty wire for the connections, but I will have to locate or make some of the bus bars if I want to use the battery efficiently for powering the main part of the lab. 

When ready the lab solar power system should be able to deliver/store 12V - 200Ah and shared with the 12V system, an added 12V -> 24V for use with soldering iron and computer. I also have a 100W inverter, so it should be possible to power the spectrum analyzer and the TRX test set, plus other 230V test equipment for limited periods. This system should also be used for the charging/balancing of the remaining LiFePO4 cells.

Also, I noticed a substantial amount of switching noise from my primitive switch mode charger for the single cells, so I will have to limit the charging/balancing of the remaining cell to the night time, then get some EMI filtering connected as soon as possible.

2022-05-27

New LiFePO4 Cells For Use With Solar Power. Test And Charging.

I picked up 28 unused, but older LiFePO4 cells, and started setting up a test system for them.

I also picked up some BMSs (Battery Management System), 2 for 12V 50/100A, and one for 24V 50/100A systems. I may need to get one or two more.

Solar Power Charging: 

The charging system for those batteries are configured like this:

I am using my solar system in my lab, described in the previous post, i.e. 2x 100W solar panels, charge controller and 3x 30Ah / 12V batteries. This may be expanded a bit with more batteries in parallel. providing a nominal capacity of about 180Ah. Because the batteries are GEL type, I count on a total usable capacity of about 90-100Ah.

The single cell charger consists of a DC/DC buck (step down) converter capable of delivering a maximum peak current of 20A, with CV (Constant Voltage) and CC (Constant Current) settings available on the PCB. To be sure of avoiding overheating I have set those like this:

CV: 3.60V (the upper limit of charge voltage for LiFePO4 cells)

CC: 10A (Just to keep it cool)

The circuit does have a fuse in the battery lead, a 15A one. A bit of redundancy is good. The system should not make a show of spontaneous combustion ;) .

This system is now running, and the first cell is being charged. Things seem to run smoothly right now - no overheating.

More Efficient Energy Use:

The intention is to get all 28 cells tested for capacity, then match them for the best possible batteries.

For this I could just use a resistive load and waste all the energy. Here is the idea to avoid some of this waste:

When I have 4 cells fully charged I will get them balanced for voltage. This happens with 4 low-value resistors, one in series with each battery (plus connection). When connected all in parallel the 4 battery-resistor sets will slowly balance the voltage of the cells. This is the simplest way to do this, and may not keep the batteries in balance long term, but that can come later, when all cells have been fully tested.

The first 4 cells can then be connected with a BMS to form a second 12V power supply, provisionally. With this and a second charging circuit, and considering the losses in the system, this system should be capable of charging 3 cells from (near) 0 to full charge. The 4th cell can be charged from the solar system, providing a new 4-cell battery for test charging the next cells. I could also be connected as a provisional (second) solar power system.

This is a long process, but it will test the cells for reaching the full charge voltage.

Checking Capacity Of Single Cells:

The intention is expanding the 12V system for the radio station, and also create an expanded battery capacity in the lab upstairs.

I expect the 12V battery at the station to be about 300Ah (12 cells), and the lab system to be 200Ah (8 cells).

The first system should likely be the one for the lab. So a full test will have to be made of enough matched cells (8 pcs) to make the 12V - 200Ah battery with all cells the closest possible with respect to capacity.

For this a discharge system has to be made. This could be a simple resistive load with a digital meter. The meters I have seen, however, need 6.5V, so they cannot be used for testing a single cell. Hmmm!

Can I program an Arduino (or the like) and make a simple circuit for testing capacity? Of course...

The simplest solution will be making a simple constant current load (or a simple resistive load) and measure the time before the output voltage reaches the lower limit of 3V, then read out the time and switch off the load. Not too difficult with an Arduino, even with my limited programming skills.

I do not need to measure the absolute capacity, just to match the cells, so the resistive load should be sufficient. The absolute capacity can then be measured when the cells are connected as a 12V battery.

It will take a while, as I am not constantly home to monitor the process.

Also, making this with simple means, things do take time, although they battery/cell testing is not too time consuming, as other things can be done while the tests are running.

I suspect some building of supports for solar panels, and some simple receiver circuits and/or microwave stuff, is in my future, along with the battery testing - and doing some QSOs with the radios.

No time to be bored...


Update: After some hours of charging the first cell still charges with about 8A, and the voltage rises very slowly.

2022-05-16

Solar Power Expansion.

I moved the older GEL battery system batteries upstairs into the lab:

The 4x 30Ah battery is now connected in parallel (again) and placed on the shelf next to the lab desk. 

I set up 2x 100W solar panels in series with a (max) 6A cable to the indoors. (maybe more). This is a preliminary setup, so the system can be tested (well, it has worked before, so why not again?) . A certain voltage loss is expected, but less so as the panels are in series, and the current in the cable is therefore reduced. Preliminary cable laid, and a charge regulator added, the lab 12V 60Ah system is now running and charging.

Further needed:

- improved (and shorter) cable from panels to the indoor charger/battery system

When I get more batteries I will probably move the 2x 12V/100Ah LiFePO4 batteries upstairs to use as the base 12V system. The existing lead-acid batteries can then be used together providing 24V/about 100Ah along with providing 200Ah -> about 100Ah at 12V. More solar panels will be needed for this extension, of course, as I want the charge to be the best possible.

The 12V - when finished - should be powering things like the GPS/10MHz reference generator for the spectrum analyzer, frequency counter and the transceiver test set.

The 24V part should be powering the small 24V temperature controlled soldering iron, and also a small laptop. 

When the bigger battery gets installed I can try using a (pure sine wave) inverter to power some of the 220V instruments, like the transceiver test set, spectrum analyzer and a few more.

While this system should work well in the summer time It may need some additional assistance from the mains grid in winter time. I should build some relay switching for this before the winter comes, because, of course - Winter Is Coming  (but not for several months) ;) 
For now I do have enough panels for improving the existing system with the batteries at hand, but I need to build much better supports for the panels. I also expect to start getting some larger panels, a few at a time.

Right now it is about extending the solar power system, and getting the antenna system maintained, and some indoor activity with getting some microwave (and other) stuff up and running.

There are interesting times ahead at OZ9QV. I hope it is not in the Chinese sense ;)

2022-05-10

Microwave Day.

 In the past week end I went to the Microwave Day in the town of Horsens, Denmark.

Although I have not really built any microwave equipment yet, everyone interested is welcome, and I did also go to the previous one 3 years ago - the ones in the last two years were canceled due to the COVID situation.

I wanted to take things easy, so I did the drive there on Friday, and home again on Sunday.

There were two presentations, one about the Norwegian beacon LB2SHF and the other about the 122GHz experiments. 

After the presentations there was social gathering and microwave talk, as well as Ole, OZ2OE demonstrating his 122GHz equipment. 

There was a small flea market, and I got just a few things. Two N-connector to WR90 waveguide transitions and some ancient 12GHz LNBs with WR75 waveguide inputs.

Because I have some horn antennas for both sizes of waveguide I wanted to have this. The WR90 transitions can be used as they are, and the LNBs can be used in different ways:

1) As a simple down converter, used as-is.

2) As an "active antenna". This requires a modification, taking the output of the 10-12GHz (pre)amplifier to an SMA connector.

3) Removing all the electronics and grinding a bit of material away, the LNB can also be used as a waveguide to SMA transition.

At the flea market I also saw transverters. There was an old version of the DB6NT transverter, complete with a horn antenna for a reasonable price, even if the output power was limited to 30mW. I did not bring it home, but I should probably have bought it, as I do have another 10GHz amplifier module that could have increased the output to about 200mW. A bit of a regret, but there may be other opportunities.

A 24GHz transverter, also at a reasonable price, was seen, but again, I did not bring it home. I know the seller, however, so I could probably still find it for sale.

Then there is test equipment. I had an appointment with another participant, that he would bring a 26GHz spectrum analyzer to check and possibly buy, and I did bring it home. I can now see what the things I build and buy are doing, signal-wise.

In the afternoon there was a demonstration of the 122GHz equipment at a longer distance (5km). Not that far, but not so easy. Signals were heard both ways, though.

Some time ago I purchased a CBNL 10GHz link transceiver module, but there is not much information, so I asked if any of the others had more information.

I have found a bit, but I am worried about the simple stuff: How critical is the order in which I connect the power supply. On the on6ll.be website I found the following:

Since it is used in a remote link the "base supply voltage is 48V (see the two connections at the right side of the connector). Then I see that there is a +8V connection The question is now - do I connect the 48V first, or the 8V? What I cannot easily see is where the negative bias for the GaAsFETs is generated. From the 48V converted to 7V, or from the 8V? It is not even clear if the 8V is generated on board when the 48V is connected. 

The other parts I have found sufficient information about to proceed. The LO should be somewhere around 7.5-8GHz, and the IF for the "RF/microwave" section then uses an IF of about 2.4GHz.

The T/R switching is clear enough from the description on the website, even the illustration above.

If any reader knows I would appreciate the information. I simply do not want to make a potentially destructive test, as the GaAsFETs simply will self destruct if the drain voltage is applied before the negative gate bias, as those familiar with GaAsFETs will know. If no reader knows I will have to extend the search.

Good to be back doing social activities again, there will be a few more coming up in the next months. Some of them will be outdoors, and others indoors. The next one is only a few weeks away.

2022-04-30

Some Thoughts on 10m Propagation Monitoring.

It is no secret that one of my favourite bands (especially on HF) is 10m, and I want to be able to make the best possible use of that band. 

At the moment several receivers are used for monitoring the 10m band:

- the FRG-100 for 28200 "International Beacon Project" (IBP), current draw 500mA

- The IC-703 for 10m FM, 500mA

- The AR-8200 for 10m FT8, 200mA

All in all 1.2A of current consumption, just for monitoring 10m propagation using existing (older) equipment. Even using IC-705s for all it would be less. But for monitoring this could be considerably reduced by using simple home made receivers:

- Polyakov DCRX for FT8, using a (pulled) 14.04MHz Xtal as LO, 20mA?

- Polyakov DCRX for WSPR/QRSS, using a (pulled) 14.06MHz Xtal as LO, 20mA?

- Simple DCRX or superhet w/AGC for monitoring 27.555 (20-50mA?)

- simple FM RX with FM-IC for 29.6 FM likely 25mA

- simple superhet w/AGC for 28.200 IBP, likely 25-50mA

- the box could incorporate a Raspberry Pi 2 for decoding WSPR/QRSS and/or FT8, ???mA

Some LO signals could be made with an Arduino controlled Si5351 synth board.

A modular build of this is feasible, and could start with the 28.200 IBP TX.

After this the priority would be like:

- FT8 RX

- 29.6 FM RX

- 27.555 DXB RX

Signals from all could be mixed/matched into a stereo amplifier for "placing the audio", e.g.

28.200 in the centre, the 29.6 in the left channel and 27.555 in the right channel. If more audio monitoring, the 29.6 FM channel (squelched) could be shared with another (SSB or CW) channel audio.

A start would be a simple superhet for 28.200, using a 19.2MHz crystal oscillator (probably originally used for some GSM base station) as the local oscillator, followed by a simple 9MHz "IF receiver" with an audio filter. I do have 9MHz crystals, so if I can place the frequency correctly, a simple crystal ladder filter can be used. Alternative is using a simple audio filter. A limiter for audio (probably a combined clipper/AGC) should be used for reducing the shock value if a strong signal comes up on the frequency.
It should be possible to limit the total current consumption to about 50mA for all, including the audio output amplifier, replacing a receiver using about 500mA.

It should be possible to keep the total current consumption for all those receivers, including audio amplifiers, below 300mA. This should provide a considerable power saving when used with the solar power supply, compared to the present setup, and with more functionality when finished.

Considering that at least some of this should run 24/7, the solar budget looks considerably better.

2022-04-28

More Radios on the Solar Power System.

The new solar charge regulator connected into the system, and more radios connected as loads. With the new controller I can manage around 600W peak power from the solar panels. Right now the panels provide only a maximum of 230W, so there is room for improvement, and I have some panels available

Setting this revised system up took a few hours. 

Radios connected now:

- IC-705 (running 6 - 80m with the new 30m "long wire" antenna).

- IC-7300 (running 4-6-10-(12)-15-(18)-20-40-80m with the dipole antenna)

- IC-703 (running 10 FM RX)

- FRG-100 (running 28200 Beacon RX)

- AR-8200 (running FT8 RX) will run continuously

- FT-8900 (running 70cm)

Total current consumption for all the above radios is about 2.7A, though not running all the time. 

Main radios for use will be the IC-705 and the IC-7300 and the FT-8900 for now.

As the system has been running all evening, the batteries indicate about 85% capacity left. Let us see how much sunshine is needed to get the power back up to above 95% tomorrow.

The IC-703, the FRG-100 and the AR-8200 are very inefficient as stand-by receivers and should be replaced with less power consuming receivers. Some of it should probably be home made, especially the FT8 receiver and the 28200 beacon receiver. This will likely reduce the total power consumption of the system by almost 1A - this could then be used for other  purposes, like a Raspberry Pi for running WSJT-X (FT8 monitoring).

In general, for general monitoring, the receivers should be really low power ones, as much as can be done 

I will need to test a Raspberry Pi 2 to see if it runs WSJT-X smoothly, and how the current consumption is.

Now I will have to see how this works as an independent power supply. I expect no problems from now, until October or November, but the few winter months will likely provide too little power from the solar panels. We shall see when that time arrives.